Recent content by Justin9314

  1. J

    OB 20 x 40 with plenty of learnings

    I am sure I am overthinking this, but nonetheless... I am in the process of bonding my pool. My pool pad is about 100' away. I plan to do a continuous loop, but for the 100' back to the pool pad, should I put the copper into the conduit? My mind says no since everywhere else it is in contact...
  2. J

    Hello, and share me your DIY horror stories before I start

    So I’m currently just finishing my build. I 10000000% agree on the dig. I had someone dig mine who does excavation for a living. While I thank him for doing it, it set me back at least a month and probably 4K approximately. If it wasn’t for the over dig, I would absolutely be floating in my pool...
  3. J

    For sale - Brand New CircuPool RJ60

    Nope. We welcomed our little boy and didn’t have much time. Interested?
  4. J

    For sale - Brand New CircuPool RJ60

    Hello all - Selling my brand new Circupool RJ60, still in the box. I was able to secure an Intellicenter unit that came with an SWG. I am willing to sell it for $1100 and can help arrange shipping (a fairly small box so it shouldn't be crazy to ship it). Here is the link CircuPool RJ-60 PLUS...
  5. J

    OB 20 x 40 with plenty of learnings

    Few questions for my next phases if you all don't mind :) When I bond the pool, I know I need a minimum of 4 touches (plan to do six). The question here is should this be an endless loop or is it okay to tie different sections together with a post of some type? I ordered 4 CMP brilliant...
  6. J

    OB 20 x 40 with plenty of learnings

    Question for the group... For my drainage around the pool, do I use the PVC with holes in it, the 4" black corrugated piping or do you recommend something else?
  7. IMG_0733.jpeg

    IMG_0733.jpeg

  8. IMG_0734.jpeg

    IMG_0734.jpeg

  9. IMG_0735.jpeg

    IMG_0735.jpeg

  10. IMG_0737.jpeg

    IMG_0737.jpeg

  11. J

    OB 20 x 40 with plenty of learnings

    Footers are poured! On to plumbing and electrical.
  12. J

    New DIY builder

    I just went through this but worse. I used concrete piers. Worked out perfect. I even used red heads to secure the walls to the concrete piers.
  13. J

    OB 20 x 40 with plenty of learnings

    Now that is great! I mean $15 for a single 2 x4... :(
  14. J

    OB 20 x 40 with plenty of learnings

    Concrete is scheduled for tomorrow for footers! Based on reading through this form, my forms do not need to be straight up and down right? Since I do not have any real slopes currently? BTW, I literally cried at HD when I bought the 2 x 4s and OSB board. Luckily I was able to source some...
  15. IMG_0724.jpeg

    IMG_0724.jpeg