Thanks for all the input.
The equipment is pretty new so all that stays, the routing is what is terrible and there is a lot more pressure losses (Mech Eng here) than there needs to be, plus some of the pipes are sized incorrectly (part of the certain runs of pipe is 2" and then a small section...