So, we just got our test kit in to get started with a pool SLAM due to algae on the pool walls.
Last week the pool store said we needed to dilute the pool for high CYA levels (which i didn’t understand at the time, and barely understand now). We dumped about 25-30% of the pool.
Ran the FC/CC/CYA tests today and got 2.4ppm/.4ppm/110ppm. So, it looks like we need to dump about half the pool, should have done that last week it seems.
Anyway, lots of rain coming possibly the next two days. Should we wait till after that or just go ahead and plan to incorporate more rainwater into the mix? Seems like we are starting almost from scratch but with the joy of algae in the pool.
Questions:
1. Is dumping half the pool the right approach for diluting the >100ppm CYA?
2. Should I consider the incoming rain at all in the timing of the dump and refill?
Thanks!
Andrew
Last week the pool store said we needed to dilute the pool for high CYA levels (which i didn’t understand at the time, and barely understand now). We dumped about 25-30% of the pool.
Ran the FC/CC/CYA tests today and got 2.4ppm/.4ppm/110ppm. So, it looks like we need to dump about half the pool, should have done that last week it seems.
Anyway, lots of rain coming possibly the next two days. Should we wait till after that or just go ahead and plan to incorporate more rainwater into the mix? Seems like we are starting almost from scratch but with the joy of algae in the pool.
Questions:
1. Is dumping half the pool the right approach for diluting the >100ppm CYA?
2. Should I consider the incoming rain at all in the timing of the dump and refill?
Thanks!
Andrew