I just had a new liner installed, as a matter of fact they are not even finished yet! Still putting water in and they still need to cut out light, skimmers etc. I have a SWCG ordered that is to be here Tuesday. Unfortunately I will not be able to install that for another week. But I know I need to get the water balanced before I head out of town for a week on Wednesday. So far it has been 24 hours and the pool is about half full.
Can I just put some chlorine pucks in my chlorinator and turn it on? Will that raise the CYA enough to keep the FC high enough for now? Or should I have find some CYA stabilizer and add it to the pool along with liquid chlorine before I leave town?
I know I will need salt once I get the SWCG installed and running but in the meantime I have limited options. My neighbor pool lady is also out of town for another week! She usually checks the pool and would add chlorine daily for me. But that is not an option for now.
Should I start with adjusting the TA or PH first?
Thanks!
Our old liner was installed in 2007 according to the previous owner. It was previously a very dark blue but was closer to white when we removed it. We went with a dark blue from Branded pool liners.
Can I just put some chlorine pucks in my chlorinator and turn it on? Will that raise the CYA enough to keep the FC high enough for now? Or should I have find some CYA stabilizer and add it to the pool along with liquid chlorine before I leave town?
I know I will need salt once I get the SWCG installed and running but in the meantime I have limited options. My neighbor pool lady is also out of town for another week! She usually checks the pool and would add chlorine daily for me. But that is not an option for now.
Should I start with adjusting the TA or PH first?
Thanks!
Our old liner was installed in 2007 according to the previous owner. It was previously a very dark blue but was closer to white when we removed it. We went with a dark blue from Branded pool liners.