Hey everyone,
Pool is coming up to two years old and I've noticed the concrete pad has sunk toward one end. Some pictures below. Half the nature 2 vessel is off the ground and you can see the slant from left to right on the pad. The return line from the heater has also dropped to pretty much rest on top of the gas line. I added a couple of shims under the right side of the heater to reduce any of the weight and to level it out a bit more. Wondering what solutions I should be exploring. The pad itself is not cracked and I've shoved as much dirt as possible around the base.
Thanks in advance.



Pool is coming up to two years old and I've noticed the concrete pad has sunk toward one end. Some pictures below. Half the nature 2 vessel is off the ground and you can see the slant from left to right on the pad. The return line from the heater has also dropped to pretty much rest on top of the gas line. I added a couple of shims under the right side of the heater to reduce any of the weight and to level it out a bit more. Wondering what solutions I should be exploring. The pad itself is not cracked and I've shoved as much dirt as possible around the base.
Thanks in advance.


