I'm looking at getting the RJ-60+. This is what my set up looks like.

I believe the yellow lines show my return flow to the pool. Does that seem correct?
If so, would I need to install it right before the 45 (in the bottom right) goes underground? Or is there a better place?
Also, I was thinking I would mount the control box to the left of my pentair box and wire it into the power supply for the pump (on the underside of the pentair box), so that if the pump receives power, the rj-60+ would receive power. Is this a doable plan?
Thanks for your input. I am tired of chasing LC...

I believe the yellow lines show my return flow to the pool. Does that seem correct?
If so, would I need to install it right before the 45 (in the bottom right) goes underground? Or is there a better place?
Also, I was thinking I would mount the control box to the left of my pentair box and wire it into the power supply for the pump (on the underside of the pentair box), so that if the pump receives power, the rj-60+ would receive power. Is this a doable plan?
Thanks for your input. I am tired of chasing LC...