One other question. Right now I am in the process of dialing in the chemistry post pool drain.
Chlorine = added and am currently at 6
CYA = added initially to get to 40 (currently raising it to 70)
pH = added MA to and got it dropped to 7.0; currently aerating to slowly increase it
Salt = 9 bags have been added (last test was a strip test and it showed roughly 1240)
The process of pH dropping and aerating (to get TA down to 70) is going to take a couple of days at least. And unfortunately I do not receive my Taylor salt test kit from Amazon until Wed. At what point should I actually turn on the SWG to let it read the salt for me? Should I just keep working on lowering TA and wait to add any additional salt until I get my test kit?
Chlorine = added and am currently at 6
CYA = added initially to get to 40 (currently raising it to 70)
pH = added MA to and got it dropped to 7.0; currently aerating to slowly increase it
Salt = 9 bags have been added (last test was a strip test and it showed roughly 1240)
The process of pH dropping and aerating (to get TA down to 70) is going to take a couple of days at least. And unfortunately I do not receive my Taylor salt test kit from Amazon until Wed. At what point should I actually turn on the SWG to let it read the salt for me? Should I just keep working on lowering TA and wait to add any additional salt until I get my test kit?