PB is planning to pour concrete and bond the whole pool then have the plaster (pebble tech) done after this us smoothed and repaired. Is this concerning? Concrete repair in one day, then bond the next, and on the 3rd day apply the plaster.
Is this the right approach? I'm having a hard time finding sections that explain mistakes and what to do next.
Note: we had awful rain all summer and had our pool wall cave in on one side and PB had to rebar tie and refill that side with shotcrete. It's been problem after problem and I'm beyond disappointed.