Porch is now 99% done some minor trim left to put up that I should be able to do in the next day or so but otherwise it’s basically finished
The ceiling was a massive amount of work every board was cut and nailed in place. It took me two weeks to get it done working evenings and weekends with temps 98+ and 90+ humidity everyday. Darn near killed me. And I had to build a platform out of 2x6s and 2x12s to do the area over the tub. Pro tip finish your room/area especially the ceiling BEFORE your tub goes in there. Would have been so much easier
Anyway we have owned the tub for 2 weeks and have been in every night. It has been insanely helpful with the aches and pains of working on the porch and moving my kids to their apartment (4 flights of steps in this same heat). This tub has been the only reason we were able to get up the next day after their move.
Thanks to everyone who gave advice and read my diatribe each post. Happy tubbing!










The ceiling was a massive amount of work every board was cut and nailed in place. It took me two weeks to get it done working evenings and weekends with temps 98+ and 90+ humidity everyday. Darn near killed me. And I had to build a platform out of 2x6s and 2x12s to do the area over the tub. Pro tip finish your room/area especially the ceiling BEFORE your tub goes in there. Would have been so much easier

Anyway we have owned the tub for 2 weeks and have been in every night. It has been insanely helpful with the aches and pains of working on the porch and moving my kids to their apartment (4 flights of steps in this same heat). This tub has been the only reason we were able to get up the next day after their move.
Thanks to everyone who gave advice and read my diatribe each post. Happy tubbing!









