Greece in Georgia - Taking Bids

Small world.... We actually met with the same builder last year and he showed us your design. It was crazy because he came out twice and sent over the first proposal and then never called us back after leaving him multiple emails and messages. Insane! It sounds like we dodged that bullet!
 
  • Like
Reactions: TecHHeadDD
Here ya go!!!!

Pool care links:
Print these out:
Pool School - Basic Pool Care Schedule
Pool School - Recommended Levels

Bookmark these:
Pool School - Recommended Pool Chemicals
Trouble Free Pool
Pool School - ABCs of Pool Water Chemistry

That looks awesome!!! I am hopeful that over time enjoying the pool your pain of the build will fade some.............but you made the news??? OUCH! But glad it is done.

What is left for the PB to do? Let us know if you need some help to do it yourself.

Kim:kim:
Thanks so much. Been brushing for 2 weeks and have another company doing the startup with chemicals. Working out bugs with the Omni Logic now, so I think I'm about to get my toes in soon.
 
Looks beautiful .. what’s the name of glass tile on spa .. it looks gorgeous
POWPLLC2440SPT-Luciana-Terra-Mosaic-Aquatica-Porcelain-Pool-and-Spa-Tile_1024x1024.jpg

That's the 6--inch trim and waterline tile. The glass tile is this at at Classic Pool Tile
GLV7710%202.jpg

CT GLV 7710
1x2 Blue

Looks beautiful .. what’s the name of glass tile on spa .. it looks gorgeous
 
Small world.... We actually met with the same builder last year and he showed us your design. It was crazy because he came out twice and sent over the first proposal and then never called us back after leaving him multiple emails and messages. Insane! It sounds like we dodged that bullet!
You possibly dodged incoming artillery fire🤣
 
  • Haha
Reactions: Newdude
Foreman says they had 30-40 going.
30-40 pools in some stage of construction at once? Holy smokes. Sounds like they got caught up in the money-printing Covid machine and just couldn't turn a job down. Start them all so the owners can't back out, then just deal with each fire/greasy wheel one at a time no matter how long it takes, owners be Darn. Terrible way to run a business. But sadly, I bet the builder had a banner year and learned nothing. :rolleyes:
 
30-40 pools in some stage of construction at once? Holy smokes. Sounds like they got caught up in the money-printing Covid machine and just couldn't turn a job down. Start them all so the owners can't back out, then just deal with each fire/greasy wheel one at a time no matter how long it takes, owners be Darn. Terrible way to run a business. But sadly, I bet the builder had a banner year and learned nothing. :rolleyes:
I'm guessing you'd win that bet. This year may be different since they were all over the news media.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.