New Pool/Grotto/Slide- Started May 28th

We have a jumping ledge!! He said he will be here at LEAST another week doing the waterfall/grotto/ledge. But it’s coming along!
 

Attachments

  • 5EFC2A8E-D928-4280-A7AF-A38B81DE2DF4.jpeg
    5EFC2A8E-D928-4280-A7AF-A38B81DE2DF4.jpeg
    658.3 KB · Views: 129
  • 864C9999-35AA-4A5D-A3D9-1132E4E9B765.jpeg
    864C9999-35AA-4A5D-A3D9-1132E4E9B765.jpeg
    487.3 KB · Views: 130
Framing for our deck begins Saturday! The waterfall/slide and tile has taken 4 weeks. They have worked on it 6 days a week for 4 weeks. I never realized how slow of a process this is. But we are being patient. The problem is they have 3 guys but only one actually lays the tile and coping. So, they get about 10 pieces of flagstone down a day. ? Thanks for letting me vent!! Lol... ALMOST. THERE.
 

Attachments

  • E2B3CB02-82C8-4863-9491-9427C1743458.jpeg
    E2B3CB02-82C8-4863-9491-9427C1743458.jpeg
    671.3 KB · Views: 118
  • Like
Reactions: jtburf

Enjoying this content?

Support TFP with a donation.

Give Support

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.