I have lurked on this excellent forum for long enough. After about a year of planning, researching, and general second-guessing, I started my 18x36 steel pool build about two week ago. I am doing as much of the project myself as I can including excavation. Here are some picture of the excavation. Of course, a multi-month drought ended promptly after the rental backhoe arrived. I've started setting the walls, my deep end washed out pretty bad in the rain, so I'm a little concerned about the space that has opened beneath the deep-end center wall section (it is not fully set in place yet with stakes or fully bolted. I'm also wondering for a couple of areas where my walls are low, what do people use to get them back up to level? I've seen some photos where it looks like wooden wedges are inserted. I'm low less than 1/2" in just one two section area of wall.




