Hello all,
First post here. After paying a pool guy for several years at $55/month to just handle the chemicals, I've decided to go the TFP route. We just finished remodeling our 25 year old pool, basically everything except digging the hole and gunnite. Equipment listed in signature. Pool was finished late July, and just had the startup process completed and salt added. I ordered the K-2006 test kit and SpeedStir, but in hindsight should have gotten the TF-100. I’m now trying to dial in the SWG, IntelliPH, and pump runtimes. I just installed the IntelliPH yesterday, and have it dialed way back for now. Here are my current readings:
FC – 6.5
CC – 0
pH – 7.6
TA – 80
CH – 220
CYA – 45
SALT – 2900
So, using PoolMath, my immediate needs are to slowly raise my CYA to ~70, then a day or 2 later get my CH to ~350.
Just want to make sure I’m right track.
Thanks, Ken
First post here. After paying a pool guy for several years at $55/month to just handle the chemicals, I've decided to go the TFP route. We just finished remodeling our 25 year old pool, basically everything except digging the hole and gunnite. Equipment listed in signature. Pool was finished late July, and just had the startup process completed and salt added. I ordered the K-2006 test kit and SpeedStir, but in hindsight should have gotten the TF-100. I’m now trying to dial in the SWG, IntelliPH, and pump runtimes. I just installed the IntelliPH yesterday, and have it dialed way back for now. Here are my current readings:
FC – 6.5
CC – 0
pH – 7.6
TA – 80
CH – 220
CYA – 45
SALT – 2900
So, using PoolMath, my immediate needs are to slowly raise my CYA to ~70, then a day or 2 later get my CH to ~350.
Just want to make sure I’m right track.
Thanks, Ken
