So the latest issue uncovered in my not so fun pool build. We noticed this small gap between the pillar and the second step into the pool Is very awkward and I think it’s going to become an algae farm. We noticed it after shotcrete a couple months ago but hav been dealing with so many other issues that now are on this.
That gap is currently 6” wide, after pebble it will be 4-5” wide, not sure how they even get plaster in there and how do you brush it. Plus I have a feeling that will be green with algae all the time.
So how did it get there? Well the original water feature wall was only 8 feet, that left a 2.5 foot space between the lower step and the pillar, when we changed it to 12 feet the step was shortened and the small gap was created. You cant see this on the CAD drawings or video rendering.
Notice that that second step is very narrow, when I walk in my heel is hitting the edge As it’s only 10.75” wide compared to the 18” of the other normal step. I think it’s a safety issue, algae, issue and cosmetic issue. So, we are going to have the step widened to 17.5” and will touch the pillar.
All good? Well I am thinking easy fix, drill add rebar and re-shoot with shotcrete, well they started talking about hand packing this with hydraulic cement
. I’m thinking cold joint?
thoughts?
That gap is currently 6” wide, after pebble it will be 4-5” wide, not sure how they even get plaster in there and how do you brush it. Plus I have a feeling that will be green with algae all the time.
So how did it get there? Well the original water feature wall was only 8 feet, that left a 2.5 foot space between the lower step and the pillar, when we changed it to 12 feet the step was shortened and the small gap was created. You cant see this on the CAD drawings or video rendering.
Notice that that second step is very narrow, when I walk in my heel is hitting the edge As it’s only 10.75” wide compared to the 18” of the other normal step. I think it’s a safety issue, algae, issue and cosmetic issue. So, we are going to have the step widened to 17.5” and will touch the pillar.
All good? Well I am thinking easy fix, drill add rebar and re-shoot with shotcrete, well they started talking about hand packing this with hydraulic cement

thoughts?