Here are some pics of the cabana under construction. We'll be putting a red metal roof on the top this week. We will be putting 4 8"x8" posts out front, 2 in the corner and the other 2 about a foot in from them and they'll be delivered today. The exterior walls will be stucco'ed a cedar color with a rough texture. The interior walls will have a smooth stucco finish in a tan color to match the deck. Cabinets and countertops will added soon as well and it'll have a full kitchen and all the appliances are here but we still have to pick out the grill. The door on the left side is to a bathroom. The door on the inside leads to the pool equipment, panels and storage.
I have four Boston Acoustic Voyager 7's coming; 2 will go in the cabana up in the corners and the other two across the pool on the fence, and two subs will used as well.
Here are the posts we're using.
and we'll be putting two of these up in the pool-side gable for aesthetics...
I have four Boston Acoustic Voyager 7's coming; 2 will go in the cabana up in the corners and the other two across the pool on the fence, and two subs will used as well.
Here are the posts we're using.

and we'll be putting two of these up in the pool-side gable for aesthetics...
