Umbrella install

The umbrella sleeve is 95% in the gunite and maybe 5% in the plaster. I am not sure there are any waiting periods for this I was not told to wait. I would probably let it go 2 weeks or so to make sure the plaster is fully cured.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.