Looking for some advice on the timeframe one should wait before removing forms for decking. I had the concrete for the decking poured yesterday and the subs pulled the forms after only a few hours. Is this normal? Something tells me that this is not the ideal way to let concrete cure and I may be left with a sagging and cracked deck in the not too distant future. They poured about 4 inches of concrete with a beam along the outside edge of anywhere between 8-10 inches.