When adding liquid chlorine for a SLAM, does the 10 minute rule referenced in this article apply for how long to wait until testing Cl levels? Or is advisable to wait longer?
www.troublefreepool.com

How long to wait between adding pool chemicals
The wait times between adding pool chemicals is usually around 10 minutes each, as that is also sufficient time for the chemicals to mix in the water.
