Time between adding dry acid and chlorine

Welcome to TFP.

15 minutes will do. 30 minutes is more then enough.

Note that continuous use of dry acid is not recommended for many pools. Read Acid - Dry Acid
 
  • Like
Reactions: mochidis
Thankyou! For some reason I thought the wait time was longer in between sodium bisulfate compared to muriatic acid. Same timing, 30 mins, right? mind, I thought that because dry acid in powder form instructions said to circulate for at least 4 to 6 hours.
 
Thankyou! For some reason I thought the wait time was longer in between sodium bisulfate compared to muriatic acid. Same timing, 30 mins, right? mind, I thought that because dry acid in powder form instructions said to circulate for at least 4 to 6 hours.

I have never heard if that.
 
  • Like
Reactions: mochidis
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.