- Mar 22, 2010
- 69
Well it's been a wild couple of days here in NC. As for the pool this is where we were yesterday with even more work completed today.
While digging the trench for the retaining wall they nicked my power line so a call to Duke Power and an emergency line fix later, I am waiting to get my bill. In the meantime I've been battling a lower abdomen pain that won't go away and the doc wants to open me up to do some exploratory surgery which will keep me out of my brand new pool for 4-6 weeks.
Was going to do the retaining wall ourselves but will have to either live with the moat behind the pool for a month or so or hire it out. This has been an interesting build and I have learned a lot for next time....

While digging the trench for the retaining wall they nicked my power line so a call to Duke Power and an emergency line fix later, I am waiting to get my bill. In the meantime I've been battling a lower abdomen pain that won't go away and the doc wants to open me up to do some exploratory surgery which will keep me out of my brand new pool for 4-6 weeks.

Was going to do the retaining wall ourselves but will have to either live with the moat behind the pool for a month or so or hire it out. This has been an interesting build and I have learned a lot for next time....