Thanks for the encouragement!
Moving a drain collector and some sprinklers to make room for the pavers today.
The PB finally sent a quote yesterday for the work already completed. He lowered the cost for the 2 1/4" beam raise by $500. The second line for the skimmer was $400, so it comes to $5.71/ft for the 70' run to the pad. Gas line at 25' was $675. He said that was his cost. Doing some reasearch I found the 1 1/2" flex MDPE gas line at $1.70/ ft in a 100' roll and but the risers are $120ea x 2. I had no idea how expensive those risers are. These 3 scope changes added $3,075 to the project.
Moving a drain collector and some sprinklers to make room for the pavers today.
The PB finally sent a quote yesterday for the work already completed. He lowered the cost for the 2 1/4" beam raise by $500. The second line for the skimmer was $400, so it comes to $5.71/ft for the 70' run to the pad. Gas line at 25' was $675. He said that was his cost. Doing some reasearch I found the 1 1/2" flex MDPE gas line at $1.70/ ft in a 100' roll and but the risers are $120ea x 2. I had no idea how expensive those risers are. These 3 scope changes added $3,075 to the project.