- Dec 26, 2016
- 34
- Pool Size
- 15000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- CircuPool RJ-45 Plus
My pool has been testing over 1200 ppm for CH for more than a year. Currently at 1350. I've managed to keep my CSI in range by allowing my TA to naturally balance at 50. I only have to add acid every few days to keep the PH at around 7.6-7.8. I've been anticipating having to refill the pool once I started seeing the water cloud up or calcium scaling on the tile or pool. But it still hasn't happened. Thanks to TFP, it's remains perfectly clear water with no scaling. I'm convinced it was my re-plaster job that caused the high CH. My question is, is it safe to continue to maintain the high CH or should I be proactive and refill the pool to get the CH down to recommended levels? I've been avoiding all this time because my family and friends think I'm crazy. They say I have the clearest and nicest pool they have seen. If I wasn't measuring this, I wouldn't suspect anything was wrong.
Last Measurements:
CYA 50
FC 4.0
TA 50
PH 7.6
Last Measurements:
CYA 50
FC 4.0
TA 50
PH 7.6