After much consideration, we selected Stonescape mini Pebble Aqua Blue and the PB said it would cost $1150 more than Auqa White because it's a level 2 color. Supposedly level 2 and 3 colors take an extra day to install. Does this sound right? Why does it take 2 days to install Aqua Blue vs 1 day for Aqua White?
The pool and spa are 630 sq ft.
Pricing from the builder.
FIRST LEVEL STONESCAPES MINI PEBBLE ARE WHITE, AQUA COOL, SALT AND PEPPER.
SECOND LEVEL AQUA BLUE, BLACK, JADE, MAUVE, CARRIBEAN BLUE, FRENCH GRAY, SAND, TAHOE BLUE, AQUA WHITE, IRISH AND ESMERALD - UPGRADE $1,131
THIRD LEVEL MIDNIGHT BLUE, TROPICAL BLUE - $1,711
The pool and spa are 630 sq ft.
Pricing from the builder.
FIRST LEVEL STONESCAPES MINI PEBBLE ARE WHITE, AQUA COOL, SALT AND PEPPER.
SECOND LEVEL AQUA BLUE, BLACK, JADE, MAUVE, CARRIBEAN BLUE, FRENCH GRAY, SAND, TAHOE BLUE, AQUA WHITE, IRISH AND ESMERALD - UPGRADE $1,131
THIRD LEVEL MIDNIGHT BLUE, TROPICAL BLUE - $1,711
Last edited: