- Jul 21, 2013
- 65,110
- Pool Size
- 35000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Pentair Intellichlor IC-60
would be if I schedule the spillover mode to come on 4 times a day for 15 min or twice a day for 30 mins....
Really does not matter.
The whole purpose of running the spillover is to dump the spa water into the pool and get water at the chlorination level of the pool back in the spa.
Twice a day in early morning and mid-afternoon is sufficient. If doing it four times a day makes you happier then that is fine.
How long depend on the size of your spa and flow rate of your pump. If your pump is running 50 GPM to a 500 gallon spa then 10-15 minutes is sufficient. 30 minutes is more then enough.
do I schedule this on top of the "normal running schedule" or do I need to account for spillover mode in the normal schedule? Thanks!
The water is pulled from your pool and ends up back in your pool by way of the spillover. The normal pool circulation just takes a detour through the spa and spillover instead of out the returns. Nothing special to account for.