I am installing a solar panel array (Heliocol) on a patio roof. As shown in the picture below, the feed and return lines come down from the roof along a vertical post, then continue into the ground where they run horizontally about 25' before turning straight upwards to the pool equipment pad in the pool house. Where is the correct place to install the 3-way solar valve and check valve if I want automatic/gravity drain down of water in the solar panels? A traditional installation (like second drawing below) has the valves at the equipment pad but would this work in my up-down-up pipe run? Should the valves better be on the vertical post going up to the roof? (And what is the point of the drain-down solar valve if the water then runs straight into a check valve?) Any thoughts/guidance appreciated.