Shotcrete contractor made a mistake on the depth of our Baja shelf. Was supposed to be at -12, but it is at -15. The contractor is saying they can fix it if I want by pouring a new slab on top (3").
-Pour the slab
-Ask them to jackhammer out concrete cut rebar and redo
-leave it as is
What do you think is best option. I do not want future problems because of this mistake.