Hi, I’ve been digging down to get a level area to set a 24 foot round above ground pool. All the sod is removed and I’m in the soil that’s underneath the topsoil.
My question is, what size rocks are acceptable to be underneath the2-3” layer of sand? I have a lot of 1 to 1 1/2 inch diameter rocks mixed in with the soil that I am working through. It will be a lot of work to get rid of “all” rocks!
Please help!!
My question is, what size rocks are acceptable to be underneath the2-3” layer of sand? I have a lot of 1 to 1 1/2 inch diameter rocks mixed in with the soil that I am working through. It will be a lot of work to get rid of “all” rocks!
Please help!!