Hello,
Every time I put the light back after repair I I’ve alway had a hard time make it sit tight. I usually put the hook (pic below) of the light (pentair 5g) behind the tabs of the niche (weird looking tabs as in pic below) then crew in the bolt through the hole on the opposite side. But the hook always slides off the tabs and the light doesn’t sit tight against the wall.
Then I watched several YouTube clips, everyone just use the one bolt to secure the light and not bothered with the hook/tabs on the other side. Is that the correct way? What is the hook on the light for?
What makes it more difficult for me is the screw hole is not at the top of the niche but at 2 o’clock position, and not draining the water.
The pic not from my pool
Thx
Every time I put the light back after repair I I’ve alway had a hard time make it sit tight. I usually put the hook (pic below) of the light (pentair 5g) behind the tabs of the niche (weird looking tabs as in pic below) then crew in the bolt through the hole on the opposite side. But the hook always slides off the tabs and the light doesn’t sit tight against the wall.
Then I watched several YouTube clips, everyone just use the one bolt to secure the light and not bothered with the hook/tabs on the other side. Is that the correct way? What is the hook on the light for?
What makes it more difficult for me is the screw hole is not at the top of the niche but at 2 o’clock position, and not draining the water.
The pic not from my pool
Thx