We are rebuilding our house and intend to replaster the pool and redo concrete deck and new pool equipment at the same time. We will also replumb to put new pool equipment under the elevated house.
i have 2 questions for the group...
1. The last time we replastered We found a guy in SC that travels around the state and he did the replaster for 10k. I reached out to him and he no longer travels. I just got a quote for 30k from another company. What is the going rate for just a replaster and tile/cove job in SC?
2. We are doing the concrete around the pool as part of the home rebuild. Is it wise to leave the water in the pool during rebuild and then replaster at the end of the build? Should we drain the pool? We have a very high water table. We will be redoing all plumbing and adding new pool equipment. Everything is at the end of its life. Any suggestions on timeline are appreciated. Thanks
i have 2 questions for the group...
1. The last time we replastered We found a guy in SC that travels around the state and he did the replaster for 10k. I reached out to him and he no longer travels. I just got a quote for 30k from another company. What is the going rate for just a replaster and tile/cove job in SC?
2. We are doing the concrete around the pool as part of the home rebuild. Is it wise to leave the water in the pool during rebuild and then replaster at the end of the build? Should we drain the pool? We have a very high water table. We will be redoing all plumbing and adding new pool equipment. Everything is at the end of its life. Any suggestions on timeline are appreciated. Thanks