We just ordered/received a CircuPool RJ-45 PLUS Salt Chlorine Generator. I tested salt, got 8 bags of pool salt, and got all the pvc etc needed for installation. My question is this: I have tomorrow off work and planned to help my husband with installing everything, but we haven’t been able to add salt yet. I know the salt needs 24 hours to circulate before we power and run the SWG, but because of timing if we add the salt in tonight, we won’t be able to keep the filter running while we planned to install/work on the pvc tomorrow. So could we install the cell and everything tomorrow, but hold off on connecting the SWG to power (allowing the filter to run water through to circulate the salt, without the cell being connected to power yet)? Just while the salt dissolves? Does that hurt the SWG cell if water is running through it without the power connected? Or should we wait to install the SWG cell and new pvc until after we’ve got the salt levels exactly where they need to be?
We just don’t want to lose a day to work on installation if we can avoid it!
Thanks!
We just don’t want to lose a day to work on installation if we can avoid it!
Thanks!