They just finished installing tile. I guess sometimes the height of the bond beam is not level. The tile guy kept the border level. So in the ledge, in order to have no cuts there is a small gap in some spots. I would say 3/4 max in some spots. The plaster will be half inch. Will this look uneven once they plaster?