I just finished installing the coping (12"x12" silver travertine) which I think turned out great! I also just finished the step-tile (2"x2" glass tile). I am doing the tile and coping myself, and hiring a company to do the plastering.
Question 1: Do I need to grout the step-tiles, or will the plaster fill it in when it gets poured and then wiped off the face.
Question 2: I have the intellibrite pentair LED light. The niche is already in (at the gunite stage) and I have the string ready to pull the wire. Do I install the light fixture itself before the plaster, or wait until the pool is filled up and pull it then? And if you install it before hand, is the lens protected somehow from the plaster?
Thanks, I am also welcome to any and all advice about anything else I need to know in preparation for plaster.
Question 1: Do I need to grout the step-tiles, or will the plaster fill it in when it gets poured and then wiped off the face.
Question 2: I have the intellibrite pentair LED light. The niche is already in (at the gunite stage) and I have the string ready to pull the wire. Do I install the light fixture itself before the plaster, or wait until the pool is filled up and pull it then? And if you install it before hand, is the lens protected somehow from the plaster?
Thanks, I am also welcome to any and all advice about anything else I need to know in preparation for plaster.