So when I cloud the pool last year I removed the spa jets, but did not re-instal the outer rings between that hold the bench to the pipes (because they broke when being removed, and I ordered spares). So basically I just plugged the pipes with the plugs, but they were free to move behind the bench. Yeah, bad idea. 
so of course w/the harsh winter the pipes have moved slightly behind the bench. One has moved about 1/2", the other about an 1/8 of an inch. I can reinstall the jets, but the outer rings won't secure anymore because their not properly aligned...
Any safe way to realign the bench bulkhead w/the pipes? It's a concrete deck, which I'd prefer to not rip up.
TIA
so of course w/the harsh winter the pipes have moved slightly behind the bench. One has moved about 1/2", the other about an 1/8 of an inch. I can reinstall the jets, but the outer rings won't secure anymore because their not properly aligned...
Any safe way to realign the bench bulkhead w/the pipes? It's a concrete deck, which I'd prefer to not rip up.
TIA