We are towards the end of construction of our guinite pool. 5 weeks post fill and waiting for our automatic cover to be installed so at the end of our pool (see photo) we have a well where this cover will go.
During construction guinite was shot then they came back and constructed the “steps” that step up behind the tanning ledge to the cover ledge by hand and tiled and grouted.
The pool has been filled a little over 5 weeks and the “fill line” is almost to the second step. Overflow is over that into the well.
Problem: what we notice is continuous weeping/moisture apparently from the pool between the concrete and the guinite. We are in Atlanta so not major temps swings but this seems concerning for eventually deteriorating and delaminating. Or will I be dead by then and find something else to think about.
During construction guinite was shot then they came back and constructed the “steps” that step up behind the tanning ledge to the cover ledge by hand and tiled and grouted.
The pool has been filled a little over 5 weeks and the “fill line” is almost to the second step. Overflow is over that into the well.
Problem: what we notice is continuous weeping/moisture apparently from the pool between the concrete and the guinite. We are in Atlanta so not major temps swings but this seems concerning for eventually deteriorating and delaminating. Or will I be dead by then and find something else to think about.