MAPR-Austin
In The Industry
Anyway, we got a quote for $1500 for replastering the spa but apparently it will take 30 days to cure. So I think I will wait till late summer when we have our 3-4 month drought to do it, I think I can isolate the spa from the rest of the pool.
Just FYI, the 30 day cure should take place with the spa full of water and you can use it during the cure period. The material will need the water to help hydrate and cure properly.