Going through a full renovation including making the main drain operational again. Since the old pipe was compromised, the contractor decided to cut a channel through pool shell to install a new drain. See photos. I’m worried that the pipes are too shallow and don’t allow for enough concrete fill? Any advice on whether this is being done correctly or not would be greatly appreciated. Thank you