Hi, had pool completely remodeled (surface, tile, all new equipment except heater) about 6 months ago. Now we have a pretty obvious pool leak. Luckily, the pool is still under warranty with the company we used. They are coming out in a couple weeks to do a full leak detection on it, but told me I needed to heat the pool to 85. Does this sound normal? Why is that needed? I'm just curious. Unfortunately, the builder never gives me any details and is quite short with me. Thanks.
Mike
Mike