my pool equipment is installed in a elevated area, roughly 5ft above the two skimmers and 14 feet above the main drain. My pool builder used 1.5inch PVC for the whole plumbing.
Each skimmer and Main drain has its own separate 1.5inch PVC run to the equipment manifold.
And for returns I have 4 returns, and 4 deck jets. Each set of returns and each set of deck jets have their one 1.5 inch PVC run back to the pool. There is a total 4 lines coming out from the return manifold at the equipment pad.
I want to change my equipment pad manifolds and equipment plumbing to 2inches. The idea behind it is to increase water movement and reduce pressure. As 2inch plumbing on the equipment would be able to suck more water of those 1.5” individual lines better than a 1.5 inch single line receiving water from 3 individual lines.
what you guys think, is there something I am missing?
For context, I have a 1.5hp single speed Jandy FloPro. Have heck of a hard time priming, think becuse of the height of the equipment.
Each skimmer and Main drain has its own separate 1.5inch PVC run to the equipment manifold.
And for returns I have 4 returns, and 4 deck jets. Each set of returns and each set of deck jets have their one 1.5 inch PVC run back to the pool. There is a total 4 lines coming out from the return manifold at the equipment pad.
I want to change my equipment pad manifolds and equipment plumbing to 2inches. The idea behind it is to increase water movement and reduce pressure. As 2inch plumbing on the equipment would be able to suck more water of those 1.5” individual lines better than a 1.5 inch single line receiving water from 3 individual lines.
what you guys think, is there something I am missing?
For context, I have a 1.5hp single speed Jandy FloPro. Have heck of a hard time priming, think becuse of the height of the equipment.
Attachments
Last edited by a moderator: