New Pebble Sheen pool here that was just turned over to me after a 30 day startup by my PB. I'm finding the recommended ranges for chemical levels are different from those found here. I'm thinking I should follow the ones from Pebble Tec but can anyone comment on the significance of the difference? The CH and TA ranges don't even overlap.
From TFP, Plaster with SWG:
FC 3-5 (See chart)
pH 7.2-7.8
TA 60-80
CH 350-450
CYA 70-80
From Pebble Tec's maintenance document:
From TFP, Plaster with SWG:
FC 3-5 (See chart)
pH 7.2-7.8
TA 60-80
CH 350-450
CYA 70-80
From Pebble Tec's maintenance document:
