Ok here's my dilemma. I installed and had my pool filled 4 days ago (12 X 26 EZ Panel Pool, installed mostly inground). I temporarily hooked up the pump only (NO Filter) to circulate the water (big mosquito problem around here) and tossed in a floater with 3-3" tabs. Well today while waiting on the landscaper to show up to grade and seed my yard, I started adding chemicals (Shock, Alkalinity Up, and CYA). I had every intention of hooking up the sand filter this evening and getting the TH up tomorrow, but when the last of the seed mat was put down....Mother Nature decided to let the bottom out of the sky. Now my freshly backfilled and graded yard is ankle deep muck!!! :grrrr: This is the luck I've had with this pool from heck so far.....anything that could have possibly gone wrong....HAS! I built my own home (2800 sq ft) in 4 months pretty much by myself, and I told the wife.....I would rather build 5 more houses than deal with another pool! I'm so stressed, frustrated, and disgusted with this whole experience thus far....hope things get better!
My question is, if I'm not able to hook up the filter until the ground dries out next week, exactly how bad is that going to be?
Water temp today was 84 and 2 hours after adding chemicals here's what things read, hardness-0, TC-10(high I know), FC-5, TA-40, CYA-0-30....yeah I used the test strips the pool store sold me. I'm ordering a decent test kit.

Water temp today was 84 and 2 hours after adding chemicals here's what things read, hardness-0, TC-10(high I know), FC-5, TA-40, CYA-0-30....yeah I used the test strips the pool store sold me. I'm ordering a decent test kit.