Hi.
Had pool resurfaced 3 weeks ago (pebblecrete) and have it balanced using liquid chlorine and acid.
T/a is high atm at 100 and ph is around 7.2
Will be adding salt in 1 week and currently have the swg turned to 0 , but the pump going 6 hrs daily.
My question is, do I add salt gradually or all at once. Pool math says roughly 280kg.
Is it correct to not start the SWG for 24 hours. And what % do I set the chlorine output to initially.
Thanks
Had pool resurfaced 3 weeks ago (pebblecrete) and have it balanced using liquid chlorine and acid.
T/a is high atm at 100 and ph is around 7.2
Will be adding salt in 1 week and currently have the swg turned to 0 , but the pump going 6 hrs daily.
My question is, do I add salt gradually or all at once. Pool math says roughly 280kg.
Is it correct to not start the SWG for 24 hours. And what % do I set the chlorine output to initially.
Thanks