Well, I wish I could say we were done and our nightmare is over, but sadly that is not the case. The pool company did send the plaster subcontractor out to drain the pool and sand down the rough spots. It was a crew of 6 guys that went from one end of the pool to the other sanding. It looks better, but not great. The kool decking has been repaired 2 times and it crumbles and falls off. They have told us the wok pots are on order and will be delivered (both pots have cracks through the middle). Recently we noticed our skimmer door was getting stuck by bits of concrete quite often. When I was fixing it I notice a one inch gap between the skimmer door housing, the gap is so large you can reach behind the tile. Is this normal?