Hi everyone. I could use some help. We started this pool build at the end of August and for a lots of reasons it is still not finished. It sat with stagnant water in it until less than a week ago when they got the pump up and running. It's gone through two pea green algea cycles now where the pool builders put in shock to clear it up but now that the pump is running I'd like to get it at least some what in balance before we close it. Based on our construction progress the pool won't be ready to close probably for another month. The SWG is not up and operating so I'm manually chlorinating. I have a TF 100 test kit but haven't gotten it out and I do have a pool math subscription. The following test results came from the pool store, but the employee there was more interested in telling me about his taste in movies than he was in telling me what I needed to do with my pool. So here I am... help!
FC - 0.0
CC - 0.3
pH - 7.9
TA - 200
CH - 275
CYA - 25
Pool is currently cloudy and 67 degrees, we also just got a ton of rain. I've been gradually putting in small amounts of MA today and then follow up with liquid chlorine which was my instruction from the pool store. I've probably put in 1/3 gallon of MA since yesterday afternoon when I got the water test done.
FC - 0.0
CC - 0.3
pH - 7.9
TA - 200
CH - 275
CYA - 25
Pool is currently cloudy and 67 degrees, we also just got a ton of rain. I've been gradually putting in small amounts of MA today and then follow up with liquid chlorine which was my instruction from the pool store. I've probably put in 1/3 gallon of MA since yesterday afternoon when I got the water test done.