We've had a very productive past 2wks. The pool is up and running, fence is complete, and we've already gone swimming 3-4 times!
Here's some pictures of things that were recently completed.
Two guys did the floor work. They worked a solid 12hr day.
another picture of the pool bottom & main drains prior to final finishing
A day or 2 later our PB sent his guys out to install the liner
vacuum cleaner sucking the liner down, workers smoothing out the wrinkles
we think they did a pretty good job!
Why we're doing this
Equipment pad - valve on the bottom left goes to the deck jets. The next three valves (in order) are from skimmer1, main drains, skimmer2

Here's some pictures of things that were recently completed.
Two guys did the floor work. They worked a solid 12hr day.
another picture of the pool bottom & main drains prior to final finishing
A day or 2 later our PB sent his guys out to install the liner
vacuum cleaner sucking the liner down, workers smoothing out the wrinkles
we think they did a pretty good job!
Why we're doing this
Equipment pad - valve on the bottom left goes to the deck jets. The next three valves (in order) are from skimmer1, main drains, skimmer2