These guys work fast. I hope they also work very well. They have a great reputation so hopefully all is well. The pool is out there filling up as I type. A lot of dirt was moved; a lot of dirt is left and the installers part will be wrapped up sometime tomorrow. The backhoe and trailer are gone to another location but some of the guys will be back tomorrow to finish out after the pool has filled more.
They arrive and begin to dig. The fence has already been moved back about 24 feet - finished that over the weekend.
The little fill pool is set up to be filled.
A lot of dirt being taken out.
They were able to dump a lot of dirt over the fence into the low spot.
The pool structure going up.
They packed the red clay and also made a cove with the dirt then put a vermiculite floor and cove on top of that.
Getting the last bit of vermiculite in place on the floor. I know these pool walls are sturdy.
Pumping the water over from the little fill pool.
Just have to keep filling for a long time now.
Pool looks like it is at an odd angle because of my yard slope. It will look better once everything is filled in and the deck is in place.
They did knock down the dirt pile somewhat but this will still take a while to level out. They left me some dirt on the inside of the fence as well. It was a little low.