Hello again! It's been a while since I posted. Things sure slowed down right after I said they were moving along nicely. Haha. Rock work is done and it is so much taller than we expected! There are lots of planters built in so we can add plants and trees(in the back) to soften things up some. Concrete was poured for decking on Friday and they are now laying the flagstone. PB hopes to be done with the decking around the pool so plaster can be done next week. Irrigation guy came to inspect what needs to be done for planters and new sod we will have around decking. Equipment is supposed to go in on Saturday. Lots of little things on his "punch list" and we should be swimming by first week of June(I hope).
We had the concrete(and will have flagstone) for the pool house poured with the decking and equip. pad along with the plumbing and electric stub outs done. It may be a couple of months before we can tackle that project because of the increased cost of upgrading our decking. Ouch.
Here you can see the steps going up to the slide(all 13 of them). This is pre-flagstone decking. There will be a large plant of some sort just above flat rock above spa and in front and back of slide entry. There will also be smaller plants on both sides of the slide going down to conceal it better.
This is from inside the pool looking up at where the slide exits.
Another view. We will have 2 mountain laurels planted in the big planters in the back and some other tall plants here and there along with small flowering type plants mixed in the rock planters.
This is a view of where the equipment and bathroom will be. There will be one back wall on the pool house and the rest will be open. BR and equip will be behind this wall.
One more look at slide going down because I'm just so dang excited about it! You can see a planter next to it to the right.
And they will be rocking the outside of spa this week as well.
Ready to be done!!
Sent from my GT-N5110 using Tapatalk