- Jul 26, 2022
- 30
- Pool Size
- 16200
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Hayward Aqua Rite Pro (T-15)
Hello all! This is the first pool we'll be building and I need some advice on the quotes I'm receiving. What should I change, is there something missing, and is this a reasonable price for the Houston, Texas area? This will be a pool build only with decking around it.
Appreciate any help I can get to make sure I get this right
- Pool Size: 34x16
- Pool Shape: Geometric
- Pool Depth: 3'6" - 6'
- Plaster Finish: Pebble Sheen Level 1
- Filtering System: Hayward 525 Cartridge Filter
- Filter Pump: Hayward Tristar VS 950 Omni
- Cleaning System: Hayward Aquanaut 450 Suction Cleaner
- Heater: Hayward H-Series Low NOX 500k BTU Induced Draft Heater
- Coping: Cross Cut Travertine 3cm Paver (haven't selected color)
- Waterline Facing: Glass/Mosaic Tile ($12 Allowance) - I haven't picked out the tile
- Skimmers: 2 Hayward automatic skimmers
- Pool Returns: 6 directional (included eyeball fittings)
- Sanitation: Hayward Salt Cell T-15
- Controls: Hayward Omni Logic
- Equipment foundation: Steel reinforcement 4 -1/2” bar bond beam. Floor and walls 8" o.c. with 3/8" rebar
- Drain System: Deck drainpipe (4” PVC) to the front curb with a pop-up. 8 Area Drain Grates (4" SDR). Gutters tied into drains.
- Maintenance equipment: 8'- 16' telescoping pole, 35' vacuum, net, brush, etc.…
- Visual Feature 1: 36' of 12" Raised Beam Finished in Spilt Face Travertine; Backside of Beam Wall finished in Sun Decking
- Visual Feature 2: Two (2) 18" Sheer Descents
- Visual Feature 3: One (1) Bubble Jet on Sun Shelf
- Decking: 511 sq. ft. finished in Sun Decking
- Lighting: Two (2) Hayward LED ColorLogic Pool Low Voltage Lights in Pool. One (1) Hayward LED ColorLogic 320 Low Voltage Lights in Sun Shelf.
- Sod: Replace damaged Sod due to excavation. Includes replanting of an existing tree in the backyard.
- Sprinklers: Repair damaged sprinkler due to excavation
- Fence: Reinstall fence for excavation
- Sleeves: 6 umbrella sleeves (One on sun shelf and 5 around the pool and decking)
- Cleaning Equipment: 8’-16’ telescoping pole, vacuum head, 35’ hose, plastic wall brush, leaf net, 2-in-1 test kit.
- Plumbing and Electrical: All pressurized pool plumbing around the pool and equipment run with Sch. 40 PVC pipe. Gas supply to pool equipment performed by Contractor. Where a backwash line is required, it will be run to a sanitary sewer with a p-trap. Electrical to equipment and Lighting performed by Contractor.
Does not include the landscape work around the pool other than sod replacement. New decking will be inline with existing patio cover.
Appreciate any help I can get to make sure I get this right
- Pool Size: 34x16
- Pool Shape: Geometric
- Pool Depth: 3'6" - 6'
- Plaster Finish: Pebble Sheen Level 1
- Filtering System: Hayward 525 Cartridge Filter
- Filter Pump: Hayward Tristar VS 950 Omni
- Cleaning System: Hayward Aquanaut 450 Suction Cleaner
- Heater: Hayward H-Series Low NOX 500k BTU Induced Draft Heater
- Coping: Cross Cut Travertine 3cm Paver (haven't selected color)
- Waterline Facing: Glass/Mosaic Tile ($12 Allowance) - I haven't picked out the tile
- Skimmers: 2 Hayward automatic skimmers
- Pool Returns: 6 directional (included eyeball fittings)
- Sanitation: Hayward Salt Cell T-15
- Controls: Hayward Omni Logic
- Equipment foundation: Steel reinforcement 4 -1/2” bar bond beam. Floor and walls 8" o.c. with 3/8" rebar
- Drain System: Deck drainpipe (4” PVC) to the front curb with a pop-up. 8 Area Drain Grates (4" SDR). Gutters tied into drains.
- Maintenance equipment: 8'- 16' telescoping pole, 35' vacuum, net, brush, etc.…
- Visual Feature 1: 36' of 12" Raised Beam Finished in Spilt Face Travertine; Backside of Beam Wall finished in Sun Decking
- Visual Feature 2: Two (2) 18" Sheer Descents
- Visual Feature 3: One (1) Bubble Jet on Sun Shelf
- Decking: 511 sq. ft. finished in Sun Decking
- Lighting: Two (2) Hayward LED ColorLogic Pool Low Voltage Lights in Pool. One (1) Hayward LED ColorLogic 320 Low Voltage Lights in Sun Shelf.
- Sod: Replace damaged Sod due to excavation. Includes replanting of an existing tree in the backyard.
- Sprinklers: Repair damaged sprinkler due to excavation
- Fence: Reinstall fence for excavation
- Sleeves: 6 umbrella sleeves (One on sun shelf and 5 around the pool and decking)
- Cleaning Equipment: 8’-16’ telescoping pole, vacuum head, 35’ hose, plastic wall brush, leaf net, 2-in-1 test kit.
- Plumbing and Electrical: All pressurized pool plumbing around the pool and equipment run with Sch. 40 PVC pipe. Gas supply to pool equipment performed by Contractor. Where a backwash line is required, it will be run to a sanitary sewer with a p-trap. Electrical to equipment and Lighting performed by Contractor.
Does not include the landscape work around the pool other than sod replacement. New decking will be inline with existing patio cover.
Attachments
Last edited: