My new plaster filled, estimated 15k gallon chlorine pool was filled 4 days ago directly after plaster was done. The PB came 2 days ago to start the pump and added some chemicals. We are waiting for “pool school” through them but I checked the levels using the dipstick today and wondering if I should be adding something now?
They left a brush but didn’t discuss how to use anything so I did start brushing it based on my own research.
Ph is somewhere between 7.8-8.4
Free chlorine is 3
Total alkalinity is somewhere between 40-80 (looks closer to 40)
Ppm stabilizer is 0
They left a brush but didn’t discuss how to use anything so I did start brushing it based on my own research.
Ph is somewhere between 7.8-8.4
Free chlorine is 3
Total alkalinity is somewhere between 40-80 (looks closer to 40)
Ppm stabilizer is 0