New owner/builder build in Miami, Florida

It's going lol

Since the raised spa will be covered with glass tile, it'll be the main focus point of the pool, I'm taking my time to pick someone. I'm going based on recommendations and work that I've seen.

Electrician will be here on Tuesday to run the conduit he needs and then I can cover everything with a layer of sand and then the rest of the backfill. I'm hoping to be done with all that this week and start coping and waterline tile this week. Once the coping is done then we can start on the pavers.

My goal is to be done by the end of the month. We'll see if I reach my goal!
 
  • Like
Reactions: kimkats
Electrician came by on Tuesday to lay down his conduit:

9-D1-C9946-9-B4-B-4191-A14-A-99644194639-B.jpg

36-B12-A0-B-3778-4-C4-B-82-FE-1478-B9-FA31-FC.jpg
 
I met with 4 tile layers (all recommendations) and I have gone forward with one of them. They're working on a job now but I hope they can start on my pool tomorrow. a crew will be coming by to finish the backfill and grade out the backyard. Finally all these mountains of dirt will be gone!

I went by yesterday and picked up the coping and tile that we'll be using:

1-A3-BA7-E0-1936-47-ED-9-EE8-94-FB31-CA4-EB8.jpg

B3-D36739-1150-464-E-850-D-56-D009-A90-CDD.jpg

9-ECA7340-3377-4-E6-C-B981-1130-CDBE14-FE.jpg

2-B5-B541-A-415-E-4616-AE2-D-F934-FDCE088-A.jpg

AF215162-CB0-F-45-C9-9-DA5-243-B24-FF7-CD7.jpg

11-DE8-E27-CF16-4-BA6-B82-E-046-CD5-EFDF1-C.jpg

A7-B62-C7-D-E7-A1-48-E2-8-C9-F-AF2-BF28-C49-A5.jpg

311-CE9-A9-7158-48-F1-81-A3-3-A5657-E56-D84.jpg

56030235-9272-4-E6-B-8-CB9-00-D4463188-EF.jpg
 
  • Love
Reactions: kimmielea
SWEET! Now make sure to hand put sand under that raised pipe. Don't trust that they will do it. You want it supported for the long term.

I have a sad for your back and shoulders!! But that was so worht it!!!

LOVE the BLING tile!!! You are going to love seeing it with water and sun shining on it! What color of grout will you use?

Kim:kim:
 
SWEET! Now make sure to hand put sand under that raised pipe. Don't trust that they will do it. You want it supported for the long term.

I have a sad for your back and shoulders!! But that was so worht it!!!

LOVE the BLING tile!!! You are going to love seeing it with water and sun shining on it! What color of grout will you use?

Kim:kim:

Great idea, just went out there and did it!
 

Enjoying this content?

Support TFP with a donation.

Give Support
Coping and tile sub started bright and early this morning! I’ll post some progress pics when they leave for the day.

I do have a question regarding plaster and pavers. In what order should I do those two? My plan was to do plaster as the last step so nothing would get on it from any construction debris.

Thoughts?
 

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.