Hi everyone, I'm Bob. At the urging of my wife, I have joined this forum to get help and insight from those who have gone before us. My wife and I both grew up with pools, her in Florida and me in Arizona. My grandfather was actually a pool builder in southern California when I was a kid. Sure could use his help now.
Some background. We live on ten acres about an hour to the north of Dallas-Ft. Worth. We have and frequently ride and compete dressage horses. We also have two Doberman Pincers who love to swim in our stock tank (pond). We have been talking about building a pool for several years and about three years ago, after a lot of research, we contacted a builder out of Argyle, Outdoor Signature. We met with one of their designers and gave him a long list (including pictures) of what we wanted and also communicated a lot of what we didn't want. After several weeks of back-and-forth, we had a plan that everyone was excited about.
POOL-PLAN by Ranger_Bob, on Flickr
Unfortunately, we had to put this project on hold for a while so we could focus our resources in other directions. The PB was really good about it and said that it often takes several years to get from design to building a project. This year, things came together and we decided to move forward with the project.
We are about two months into the build and currently have gunite and second stage of plumbing complete. Here are some progression pictures.
Excavation complete.
Untitled by Ranger_Bob, on Flickr
Rebar complete.
Pool rebar 1 by Ranger_Bob, on Flickr
Lounging area.
Untitled by Ranger_Bob, on Flickr
Spa and light.
Untitled by Ranger_Bob, on Flickr
Gunite going in.
Untitled by Ranger_Bob, on Flickr
Untitled by Ranger_Bob, on Flickr
Untitled by Ranger_Bob, on Flickr
To be continued...
Bob
Some background. We live on ten acres about an hour to the north of Dallas-Ft. Worth. We have and frequently ride and compete dressage horses. We also have two Doberman Pincers who love to swim in our stock tank (pond). We have been talking about building a pool for several years and about three years ago, after a lot of research, we contacted a builder out of Argyle, Outdoor Signature. We met with one of their designers and gave him a long list (including pictures) of what we wanted and also communicated a lot of what we didn't want. After several weeks of back-and-forth, we had a plan that everyone was excited about.

Unfortunately, we had to put this project on hold for a while so we could focus our resources in other directions. The PB was really good about it and said that it often takes several years to get from design to building a project. This year, things came together and we decided to move forward with the project.
We are about two months into the build and currently have gunite and second stage of plumbing complete. Here are some progression pictures.
Excavation complete.

Rebar complete.

Lounging area.

Spa and light.

Gunite going in.



To be continued...
Bob